Battery packs cost 93% less than in 2010, and grids from Kauaʻi to California are filling up with them. See how much storage each grid already has, then use an hour-by-hour (8,760-hour) dispatch model of the Hawaiian islands, CAISO and the Western Interconnection to test what more batteries, pumped hydro, solar, wind and geothermal would do. It shows how much fuel-fired backup is still needed, how much clean energy is wasted, and which week of the year is hardest.
For a century, grids balanced supply and demand by keeping fuel-fired plants spinning, ready to ramp up. Batteries change that: they soak up midday solar and release it after dark, respond in milliseconds, and can do the grid-stabilizing job that once required spinning machines. The question for each grid is no longer whether storage works, but how much it needs and how long it has to last.
The grid-storage bar is one segment of the same 2025 survey; storage packs fell 45% in a year and are now the cheapest kind. BNEF restates every survey in that year’s dollars, so values marked ~ are put in 2025 dollars by chaining BNEF’s own year-on-year changes (approximate). Survey years in between are left out. Packs in North America cost about 44% more than the global average.
Solid bars are operating capacity; striped bars are what operators have told EIA they plan to bring online. End-2024 is derived from EIA’s end-2025 total less the 15 GW added in 2025.
The bars compare each grid’s storage power with its peak demand; the dark tick marks 100% of peak. Hours of storage is the stored energy divided by average demand: how long storage alone could run the grid on an ordinary hour. Pick a row to see the projects behind it and load that grid into the model below.
Spinning generators are locked to the grid’s 60 Hz rhythm. When a plant trips, their spinning mass slows down gradually, which buys a few seconds for other plants to respond. Most solar, wind and battery plants connect through grid-following inverters: they read the grid’s frequency and voltage and follow along, adding no spinning mass and little fault current. On an island with few machines running, frequency can fall fast enough to trip older rooftop inverters at 59.3 Hz, making the loss worse, and weak voltage can set grid-following plants oscillating. Grid-forming inverters set their own voltage and frequency the way a generator does. That is why Hawaiian Electric now requires them on new battery plants.
Bands follow common planning practice: capacity that runs more than 6,000 hours a year is baseload, 1,500 to 6,000 is mid-merit, under 1,500 is peaking.
Starting from the settings above, the planner adds the least-cost mix of new solar, wind, batteries and (where allowed) firm renewables needed to reach each target, building on the previous step the way a real buildout would. It then reports how much fuel-fired backup is still needed. The path stops at 99%, keeping some fuel-fired backup on every grid for long calm, cloudy stretches, storms and maintenance.
Each Hawaiian preset is built from 2025 filings, then run through the hourly model with its stability limits on. Two checks: the annual renewable share, and the highest share renewables reached in a single moment, which is set mostly by how much fuel-fired equipment has to keep spinning.
Oʻahu runs higher in the model because several large solar-plus-storage plants that came online in mid and late 2025 are modeled for a full year. Maui County’s reported 72.8% peak includes the small diesel grids on Molokaʻi and Lānaʻi, which the island-only model leaves out. Hourly data averages over moments, so a reported instantaneous peak can sit a little above an hourly one. On Maui the gap is too big for that alone: in 2025 operators kept more fuel-fired units on than the physical minimum modeled here. Use “Extra minimum fuel-fired output” under Grid stability to test operator practice. CAISO’s modeled curtailment is lower than the ~3–4% it reports, because the model has no transmission congestion inside the ISO.
Upload a CSV with one row per hour and any of these columns: load, solar, wind. EIA’s Hourly Electric Grid Monitor exports this for any U.S. balancing authority. Load is used for its shape and scaled to the annual total; solar and wind are used as shapes (scaled so the busiest hour equals full output).
Weather and demand, hour by hour. For each region the model builds a year of hourly weather from its known patterns: sun angle by latitude, day-to-day cloudiness that comes in runs (a cloudy day tends to follow a cloudy day), multi-day wind lulls such as Hawaiʻi’s Kona weather, and heat waves that drive air-conditioning load. Output from each resource is then scaled so its annual total matches the grid’s data. Five weather years let you check a design against bad luck.
Dispatch. Each hour, rooftop and utility solar, wind, geothermal, run-of-river hydro, biomass and nuclear serve demand first. Reservoir hydro and imports have an energy budget for each month and are saved for the hours of highest need. Surplus energy charges batteries, then is exported where the grid can export, and the rest is curtailed. When there is a shortfall, batteries discharge using a three-day look-ahead that spreads their energy across the coming evenings and nights to keep the fuel-fired peak as low as possible, the way an operator with a weather forecast would. Fuel-fired plants cover whatever is left.
Grid stability. Before batteries are dispatched, the model works out for every hour how much fuel-fired capacity must be spinning, using three tests that system operators apply. Contingency reserve: enough headroom to replace the largest single loss, plus any older rooftop inverters expected to trip with it. Batteries can hold that reserve, in which case that slice of their power and half an hour of energy is set aside rather than dispatched. On the mainland the WECC rule applies: the larger of the largest loss or 3% of load plus 3% of generation. Inertia: spinning mass from generators and synchronous condensers must keep the initial frequency fall under a limit (3 Hz/s by default) after that loss. Grid-forming batteries count as instant response, but only beyond the largest grid-forming plant, which could be the one that trips; new plants are assumed no bigger than the largest loss. System strength: fault current from spinning machines (about 5 times their rating) and grid-forming batteries (assumed 4 times, set so two 30 MVA grid-forming units could carry Maui’s lowest-load case as in NREL’s tests) must be at least the chosen ratio times the output of grid-following solar and wind. Any shortfall is met by turning on fuel-fired units, which cannot run below their minimum load, so stability can force fuel burn and curtailment. The frequency chart solves a one-bus swing equation with load damping, battery fast response and governor response. It shows the shape of the problem, not a dynamic study. “Simple floor” keeps the original fixed minimum for comparison.
What “firm capacity needed” means. It is the highest hourly output fuel-fired plants must supply in the weather year, before any reserve margin. Utilities carry 15% or more on top, and must cover the loss of their largest unit.
Limits. One year of synthetic weather is not a 30-year reliability study. The model has no transmission limits inside a grid and treats each grid as a single point, so it cannot see local voltage problems, reactive power (VAR) limits, voltage sag on long feeders, or protection settings, which real studies check bus by bus. Its unit commitment is simplified: fuel-fired capacity is one pool with a minimum load, without start-up times, ramp limits or forced outages. Behind-the-meter batteries are not modeled separately. It is built for comparing options and testing policy ideas, not for sizing a specific power plant.