Think B.I.G. Hawaiʻi · Energy Self-Reliance (ESR) framework · Oʻahu
Every major power plant on Oʻahu since 2000, sized by capacity and colored by fuel. Oʻahu uses more than 70% of the electricity generated in Hawaiʻi. Play the history, then the buildout of projects Hawaiian Electric has under contract or out to bid. Below the map, a simulator lets you choose what to build and how fast, to see when the island could get 95% of all its energy — electricity, cars and trucks, boats, interisland flights and industry — from island sources.
Hawaiian Electric, 2005–2025.
—
Icons show the technology; the colored halo’s area = nameplate MW. Dashed halos: planned or not yet built. Contours are schematic (simple cones along the Waiʻanae and Koʻolau ranges), not survey data. Green dots: rooftop solar, one dot ≈ 12 GWh a year; grey dots: off-grid homes (estimate). Moving cars, planes and boats are colored by what powers them: green = electric, light green = island-made fuel, terracotta = imported fuel; their share of each color follows the model, not counts of real vehicles. EV shares before 2025 are approximate. Plant locations are approximate.
Actual: share of sales to 2021, share of generation from 2022 (Act 240). The PSIP and statutory targets were set for all of Hawaiian Electric’s islands together, not Oʻahu alone. Hollow points are estimates.
Contracted solar and the IGP RFP push Oʻahu’s grid to roughly half renewable in the 2030s. Without much more, it stalls in the low 50s, and the new combustion plants keep burning oil unless biofuel is bought. Cars, trucks, boats, planes and industry still run on imported fuel, so all-energy self-reliance stays near a fifth.
Choose what to build and when. Results update as you move the controls. Start from a preset, then adjust.
| Item | This scenario | Reality check |
|---|
All-energy self-reliance = island renewable electricity actually used, plus off-grid solar and fuels made on-island, divided by all energy used on the island: grid electricity, road gasoline and diesel, marine fuel, interisland jet fuel, gas/propane and off-road diesel. Energy-content basis, as in the ESR framework. Transpacific flights and shipping, and the refinery’s own fuel use, are out of scope.
Grid dispatch is annual, with a simple day/night split: waste-to-energy, wind and any new firm plant serve load around the clock; solar serves the daytime half of what’s left; batteries (one cycle a day, 88% round trip) move surplus solar into the night; biofuel and then oil fill the rest. Surplus solar is curtailed unless e-fuels are switched on (50% conversion). A planning sketch, not a reliability study.
2025 starting point matches Hawaiian Electric’s 2025 RPS report for Oʻahu: 32.3% of 7,846 GWh (rooftop ~16.6%, utility solar ~8.5%, waste/biofuel ~4.2%, wind ~3.1%).
Save the year-by-year numbers for current plans and the scenario now set in the simulator, as a spreadsheet or a short PDF report. The map picture shows the year currently selected on the map’s slider.